三男一女做2爱a片免费视频_最近中文字幕mv免费高清视频_伊人精品久久久大香线蕉_亚洲精品av无码重口另类_女性私密紧致水多的危害_日日狠狠久久偷偷色综合96蜜桃_日韩va无码中文字_国产精品午夜福利片_宅男午夜大片又黄又爽大片

Contact Us

AC Fan after the installation is complete the note

Date: 2016-5-11   Click: 1679 Times

"AC Fan" after installation, flip a hand wheel, check whether tight or grazing to other sites. In the absence of exceptional circumstances, you can test run, the exposed part of the fan drive apparatus should be shielded, which in the "AC Fan" is not the whole package, user supplied, if the air inlet pipe is not connected, then, also need to add a protective cover. The fan is equipped with electronic control box must match the fan phase. In particular, note that, when the fan wiring, be sure to get a professional electrician wiring, the wiring must be correct and reliable, especially at the electrical control box terminal number must be consistent with the fan numbers on the fan after installation to check the entire installation the "AC Fan" living within the impeller is not a tool to pull down or other debris.

Back to: Industry news

+86-0769-83660708

Home Product News Contact