三男一女做2爱a片免费视频_最近中文字幕mv免费高清视频_伊人精品久久久大香线蕉_亚洲精品av无码重口另类_女性私密紧致水多的危害_日日狠狠久久偷偷色综合96蜜桃_日韩va无码中文字_国产精品午夜福利片_宅男午夜大片又黄又爽大片

Contact Us

AC Fan before installation tools ready

Date: 2016-7-18   Click: 1846 Times

"AC Fan" tools preparatory work before installation we can not say more, and other preparatory work by chapter is about the same way, the only difference is directly connected to the wind turbine installation site installation dimensions, as well as reserve installation size requirements is relatively high, the permissible error range is relatively small, foundation dimensions deviation should be within the range of ± 20mm, hollow center of each reserve size deviation should be ± 10mm between, so since we need the fan the size of each extra attention, the error is only installed to a minimum in order to make the fan installation more smoothly.

Back to: Industry news

+86-0769-83660708

Home Product News Contact